VANCOUVER, BC / TheNewswire / April 23, 2024 – Element79 Gold Corp. (CSE: ELEM) (OTC: ELMGF) (FSE: 7YS0) (“Element79”, the “Company”) reports additional results from the most recent underground and surface sampling of its flagship Lucero property.

These geochemical assays of exploration samples continue to support the immense potential housed within Element 79’s crown jewel.

“The data obtained is not just promising; it’s the cornerstone upon which our future endeavors will be built,” said James Tworek, CEO of Element 79. “These recent results coupled with historical data represent the bedrock upon which we are advancing our Lucero project.”

Among a total of 97 samples were sent for assays, 56 of which returned greater than 0.1 g/t gold (up to 8.55 g/t gold and 523 g/t silver) which are shown in Table 1. Several samples also were also rich in base metals (up to 23.7% lead and 9.9% zinc), all of which underscores the richness of our project further supporting the Company’s belief a robust resource base can be delineated.

Figure 1. Fall 2023 Sample locations (yellow stars), mapped workings (crosses), with selected Samples highlighted.

Table 1. Samples returning >0.1 g/t gold from the fall 2023 sampling program, C (channel sample), G (grab sample), S (surface), U (underground).

SampelTypeOriginWGS84 Z18S EastingWGS84 Z18S Northinglength(m)Aug/tAgg/tCu%Pb%Zn%
2101CS803,4918,296,5530.800.301.20.00.00.0
2103CS803,4938,296,6661.000.538.90.00.00.0
2104CS803,6588,296,6200.300.150.70.00.00.0
2108CS803,7008,296,4680.600.121.90.00.00.0
2109CS803,7008,296,4690.500.306.20.00.00.0
2113CS803,7308,296,4461.000.2540.10.00.00.0
2117CS803,4818,296,7361.100.123.80.00.10.0
2119CS803,4578,296,8030.500.582.60.00.00.0
2120CS803,4568,296,8030.601.579.10.00.00.1
2123CS803,3998,296,7870.502.779.70.00.00.0
2124CS803,3998,296,7880.800.275.10.00.00.1
2125CS803,2988,297,0440.351.7057.70.00.10.1
2126CS803,2988,297,0430.606.2233.00.00.10.1
2127CS803,1898,297,1460.355.01138.00.00.10.0
2128CS803,3038,296,9780.800.2717.40.00.10.1
2129CS803,2578,297,1330.401.7584.10.00.00.1
2130CS803,2568,297,1330.850.6542.60.00.00.1
2134CS803,5948,297,0720.600.1826.20.00.40.1
2139GU801,9518,294,338N/A6.9681.40.10.40.8
2140GU801,9298,294,348N/A1.0623.10.00.71.2
2141CU801,8828,294,3620.300.125.50.00.00.1
2143CU801,8328,294,3890.300.9029.10.00.10.3
2145GU801,8098,294,390N/A8.55523.00.00.40.2
2149CU801,8248,294,3920.456.1997.00.10.40.4
2150CU802,2768,293,0720.900.1440.10.12.11.3
2152CU802,2978,293,0750.302.1148.50.01.63.6
2154CU802,2978,293,0750.500.116.30.00.30.8
2156CU802,3748,293,1170.900.186.60.10.20.4
2157CU802,3828,293,1191.500.1613.70.10.32.2
2159CU802,4128,293,1190.400.1622.70.02.71.6
2160CU802,4398,293,1260.800.1034.10.22.32.7
2162GU802,4988,293,150N/A0.605.00.00.10.2
2163CU802,5208,293,1610.650.247.20.00.51.0
2165CU802,5428,293,1670.300.112.90.00.20.2
2166CU802,5968,293,1760.550.292.40.00.10.2
2167CU802,5958,293,1750.600.2023.50.02.92.2
2169CU802,3278,293,0900.550.274.30.00.00.1
2171CU802,3278,293,0910.500.4329.40.00.60.7
2173CU802,3678,293,1080.450.3714.70.00.60.3
2175CU802,3858,293,1110.900.3269.00.63.82.6
2176CU802,4058,293,1130.351.2260.80.23.72.7
2178CU802,4248,293,1160.550.175.80.00.20.3
2179CU802,4248,293,1150.400.49210.00.323.79.9
2181CU802,4248,293,1150.700.1635.30.10.11.0
2182CU802,4538,293,1260.750.177.80.00.20.2
2183CU802,5108,293,1550.800.256.60.00.20.5
2184CU802,5098,293,1560.500.6530.50.11.86.1
2185CU802,6298,293,1810.400.125.70.10.10.3
2187CU802,6768,293,1760.550.5410.60.00.40.8
2188CU802,6768,293,1760.350.2715.90.11.60.6
2189CU802,3318,293,0902.000.4012.90.00.50.3
2200CU802,3618,293,1070.400.193.30.00.30.4
2202CU802,3718,293,1080.700.125.10.00.10.1
2203CU802,3718,293,1070.650.119.10.00.90.2
2206CU802,3758,293,1081.600.162.40.00.10.2
2209CU802,3838,293,1110.300.1323.00.10.60.8

All Samples were sent for To CERTIMIN S.A. Laboratories, Lima, Peru for analysis. Standards and duplicates were inserted every 10th samples.

Recent data from assay results is pivotal for Element 79. Firstly, it will serve as the foundation for the Company’s resource development and future mine planning.  These reports are both essential steps the mine evaluation process and highlights crucial milestones in demonstrating the project’s viability.

Secondly, this data will inform the direction of the Company’s upcoming 2024 drill program, which will be guided by a 3D modelling of both geology and historic mine workings, designed to maximize efficiency and accuracy. The 3D model will harness the comprehensive dataset that has been amassed, including historic data compilation from the past-producing era leading up to 2005, current surface and underground geochemistry, review and channel sampling of underground workings, mapping (both underground and surface), geophysical surveys, as well as cross-sectional and longitudinal interpretations.

Tworek continues: “This data helps to prove from a methodical and unbiased perspective where both the ore “is” as much as where the ore “isn’t”.  When modelled in conjunction with past sampling data and historical production data, this proves that the current underground addits and open veins as well as their surface level expressions are strong economically, where future exploration and drilling campaigns will highlight where we will focus for ore extraction.“

As the Element79 team moves forward, its confidence is both in the skill and experience of its team as well as the continued positive results its work programs have yielded. The Company’s mission is to maximize shareholder value through continued development of the Lucero project, by bringing it back into commercial production, in a safe, ethical, sustainable and profitable fashion.

Qualified Person

The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Director of Element79 Gold and a “qualified person” as defined by National Instrument 43-101.

About Element79 Gold Corp. 

Element79 Gold is a mining company focused on gold and silver committed to maximizing shareholder value through responsible mining practices and sustainable development of its projects.  Element79 Gold’s focus is on developing its past-producing, high-grade gold and silver mine, the Lucero project located in Arequipa, Peru, with the intent to restart production in 2024.

The Company also holds a portfolio of 5 properties along the Battle Mountain trend in Nevada, with the Clover and West Whistler projects believed to have significant potential for near-term resource development. Three properties in the Battle Mountain Portfolio are under contract for sale to Valdo Minerals Ltd., with an anticipated closing date in the first half of 2024. The Company has also signed an Option Agreement to sell the Maverick Springs project, an advanced-stage exploratory property with an Inferred Resource of 3.71MMoz AuEq (1.37MMoz Au and 175MMoz Ag) (see 43-101 technical report titled: Amended Technical Report on the Maverick Springs Project, Nevada, USA, by Allan Armitage, PhD., P.Geo, and Rohan Millar, B.Sc. P.Geo., dated October 7, 2022, available on SEDAR) and anticipates completing this sale on or before July 21, 2024.

In British Columbia, Element79 Gold has executed a Letter of Intent and funded a drilling program to acquire a private company that holds the option to 100% interest of the Snowbird High-Grade Gold Project, which consists of 10 mineral claims located in Central British Columbia, approximately 20km west of Fort St. James.

The Company has an option to acquire a 100% interest in the Dale Property, 90 unpatented mining claims located approximately 100 km southwest of Timmins, Ontario, and has recently announced that it has transferred this project to its wholly owned subsidiary, Synergy Metals Corp, and is advancing through the Plan of Arrangement spin-out process.

For more information about the Company, please visit www.element79.gold

Contact Information 

For corporate matters, please contact:  

James C. Tworek, Chief Executive Officer  

E-mail: jt@element79gold.com 

For investor relations inquiries, please contact: 

Investor Relations Department 

Phone: +1.403.850.8050

E-mail: investors@element79.gold 

Cautionary Note Regarding Forward Looking Statements 

This press contains “forward‐looking information” and “forward-looking statements” under applicable securities laws (collectively, “forward‐looking statements”). These statements relate to future events or the Company’s future performance, business prospects or opportunities that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management made considering management’s experience and perception of historical trends, current conditions and expected future developments. Forward-looking statements include, but are not limited to, statements with respect to: the Company’s business strategy; future planning processes; exploration activities; the timing and result of exploration activities; capital projects and exploration activities and the possible results thereof; acquisition opportunities; and the impact of acquisitions, if any, on the Company. Assumptions may prove to be incorrect and actual results may differ materially from those anticipated. Consequently, forward-looking statements cannot be guaranteed. As such, investors are cautioned not to place undue reliance upon forward-looking statements as there can be no assurance that the plans, assumptions or expectations upon which they are placed will occur. All statements other than statements of historical fact may be forward‐looking statements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives or future events or performance (often, but not always, using words or phrases such as “seek”, “anticipate”, “plan”, “continue”, “estimate”, “expect”, “may”, “will”, “project”, “predict”, “forecast”, “potential”, “target”, “intend”, “could”, “might”, “should”, “believe” and similar expressions) are not statements of historical fact and may be “forward‐looking statements”. 

Actual results may vary from forward-looking statements. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause actual results to materially differ from those expressed or implied by such forward-looking statements, including but not limited to: the duration and effects of the coronavirus and COVID-19; risks related to the integration of acquisitions; actual results of exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; commodity prices; variations in ore reserves, grade or recovery rates; actual performance of plant, equipment or processes relative to specifications and expectations; accidents; labour relations; relations with local communities; changes in national or local governments; changes in applicable legislation or application thereof; delays in obtaining approvals or financing or in the completion of development or construction activities; exchange rate fluctuations; requirements for additional capital; government regulation; environmental risks; reclamation expenses; outcomes of pending litigation; limitations on insurance coverage as well as those factors discussed in the Company’s other public disclosure documents, available on www.sedarplus.ca. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. The Company believes that the expectations reflected in these forward‐looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward‐looking statements included herein should not be unduly relied upon. These statements speak only as of the date hereof. The Company does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by applicable laws. 

Neither the Canadian Securities Exchange nor the Market Regulator (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release. 

Leave a Reply

Your email address will not be published. Required fields are marked *

Sign Up for Our Newsletter

Get the latest investment ideas and strategies sent straight to your inbox.

You May Also Like

Anfield Energy to Complete a Preliminary Economic Assessment of its Slick Rock Uranium Project

Anfield Energy Inc. (TSX.V: AEC; OTCQB: ANLDF; FRANKFURT: 0AD) (“Anfield” or the “Company”)…

Lithium South Developing High-Value Alternatives in Lithium Production

VANCOUVER, B.C., April 8, 2024 /CNW/ — Lithium South Development Corporation (the “Company” or “Lithium South”)…

Graphite One Announces Exercise of Warrants

VANCOUVER, BC, Feb. 23, 2023 /PRNewswire/ – Graphite One Inc. (TSXV: GPH) (OTCQX: GPHOF)…

Copper Lake Reports High-Grade Silver Assays in First Deep Hole on New VTEM/Deep IP Discovery at Marshall Lake VMS Property, Ontario

Copper Lake Resources Ltd. (TSX-V: CPL, Frankfurt: WOI, OTC: WTCFZ) (“Copper Lake”…